Page 33 - CIWA Climate Resilience & Mitigation Assessment
P. 33

CIWA Climate Resilience & mitigation Assessment




             Annex 4: CIWA-Influenced Investments with Climate Resilience Benefits



                                   Climate                                           Adaptation
                  Sectoral       Adaptation        CIWA project components matched    Indicator    Status of
                 Grouping                                                                         investment
                                  Indicators                                          matched

              Additional
              Financing for Nile
              Cooperation for  Kabuyanda, Uganda  Irrigating 4,300 ha; hydropower 0.1 MW   Indicator 2.2  Mobilized
              Results

              Additional
              Financing for Nile  Lerekwe and Sio-  Irrigating 3,500 ha; hydropower 0.05 MW and
              Cooperation for  Sanga, Kenya     0.1 MW; storage 6.2 MCM and 5.8 MW    Indicator 2.2  Potential
              Results

              Additional
              Financing for Nile                Irrigating 8340 ha; hydropower of 6 MW;
              Cooperation for  Mara Valley, Tanzania  storage: 30MCM                  Indicator 2.2  Potential
              Results


              Additional
              Financing for Nile  Ngono Valley,
              Cooperation for  Tanzania         Irrigating 11,342 ha; hydropower of 14.5 GWh/yr   Indicator 2.2  Potential
              Results

              Additional
              Financing for Nile                Irrigating 14,674 ha; hydropower of 22 MW;
              Cooperation for  Ruvyironza, Burundi  storage 372.6 MCM                 Indicator 2.2  Potential
              Results


                              Muvumba Irrigation
              Additional
              Financing for Nile  Development and  Irrigating 13,000 ha, hydropower 3 MW, water
              Cooperation for  Watershed        supply to 188,000 people              Indicator 2.2  Potential
              Results         Management project,
                              Rwanda

              Cubango-
              Okavango                          11 irrigation schemes, an estimated 279,500
              Resilient       Irrigation        hectares planned for development. Another 16
              Livelihoods     development, Angola  schemes have been identified in Namibia, with  Indicator 5.7  Potential
              Enhancement     and Namibia       an estimated 23,200 hectares to be
              Program                           developed.

              Cubango-                          The restoration of design capacities and the
              Okavango                          accommodation of future growth to 2040 (the
              Resilient                         planning horizon of the MSIOA study) result in
              Livelihoods     Urban water supply  projected abstractions for urban water use within  Indicator 2.2  Potential
              Enhancement                       the basin of between 27.1 million cubic meters per
              Program                           year and 38.5 million cubic meters per year.

                              Chemoga-Yeda
              Nile Cooperation  Integrated       189,212 ha watershed management project;
              for Results Project  Watershed    533,811 expected beneficiaries.       Indicator 2.4  Potential
                              Management,
                              Ethiopia




                                                                                                                  31
   28   29   30   31   32   33   34   35   36   37   38