East Africa








         Dam Safety
         Capacity Building

         The ENTRO and NELSAP-CU are        Strengthening Dam Safety Units      Dam Safety Risk Framework
         working together to strengthen the
         institutionalization  of  dam  safety  Under  the  NCCR  dam   safety  An interim report on a tiered dam safety
         management across the basin through   capacity-building initiative, several   risk management framework based on
         a combination of activities to enhance   activities are underway within the   preliminary hazard classification and risk
         the  technical  capacity  of  dam  ENTRO and  NELSAP components,       screening with the Risk Index Method
         professionals,  support  institutional  along with training efforts that   was developed, and the framework was
         development of dam safety regulators,   significantly   contribute   to   tested on dams in Rwanda. A framework
         and   identify  and  close  critical  strengthening  dam  safety  units  that  incorporates  potential  hazard
         information gaps about the distribution   (DSUs). These activities include the   classification  and  detailed  risk  screening
         and risk profiles of dams in the basin.  creation of a basin-wide inventory of   using the Risk Index Method significantly
                                            dams, the development of a Dam      enhances dam safety management by
         Regional Training Center           Safety Risk Management Framework,   providing a systematic approach to
         The  inception report, Institutional   and the establishment of a basin-wide   identifying and assessing risks from dam
         Framework, and Prospective Strategic   Reference Regulatory Framework and   operations. The risk index will facilitate
         Partners Report for the Regional Dam   Guidelines.  These  key  initiatives  systematic decision making and enable
         Safety Training Center have been   directly enhance the DSUs’ technical   the identification of dams requiring further
         completed. The Center will support   capacity by enabling them to identify   detailed studies based on their risk
         regional dam safety capacity building.   and manage their portfolio of dams,   profiles.  This  allows  for  more  effective
         The report includes a training needs   prioritize riskier dams for intervention,   allocation of resources and attention to
         assessment   that   identifies   gaps   and become familiar with the above   the most critical risks that require
         between current and desired knowledge   frameworks  and  guidelines.  To  further   immediate intervention or monitoring.
         and skills in dam  safety management   build capacity,  training  sessions  were
         across the basin. It also includes   conducted during each deliverable
         competency-based,   flexible,   and   review workshop, which included the
         targeted curriculum to equip trainees   ENTRO’s capacity-building training for
         with the knowledge and skills they need   33 participants and the NELSAP’s
         to perform dam safety tasks effectively.   training for 33 people in March 2024.